Aberdeen Proving Ground Electrical Upgrade

Install new addressable Fire Alarm Control Panel (FACP), power supplies, and transmitter at a secret location. The building was equipped with a new fire suppression system, 24hr HVAC support for cooling, and temporary ATS for power transfer in case of a power outage. The new fire alarm system included remote annunciators at alternate locations and recessed/surface mounts required by the latest safety code. As part of the scope, PPE provided a disconnect junction box for CLP to terminate lines at the location that met National Electric Code (NEC) requirements for permanent installation in the event that it becomes a permanent install.

Pro Power and Electric team members coordinated directly with the local fire department and City, Light, and Power (CLP) to ensure open client communications throughout the project.